AdvancedAzure 305 project · about 18 hours

Business continuity and migration design

Design backup, disaster recovery, high availability and a migration plan.

The real-world brief

A bank must move a core app to Azure with tight recovery targets.

What you will build

  • Recovery targets per component
  • An HA and DR architecture
  • A migration plan in waves
  • A Well-Architected review

Skills you will practise

Business continuityHigh availabilityMigration planningWell-Architected review

Tools

Azure Site RecoveryAzure BackupAzure MigrateAvailability zonesAzure Front Door

Project tasks

The detailed steps, checklists and trainer review open in the SOTT student portal for enrolled students.

1Targets Steps in portal
2Design Steps in portal
3Migrate Steps in portal
4Review Steps in portal
5Present Steps in portal

How companies use Azure 305

Travel: Staying online when a data centre fails. A booking site went down when one zone failed. The app was spread across zones with load balancing and managed databases. A later zone failure caused no outage.

Startup: Paying only for what is used. Servers sat idle most of the day. Event-driven parts moved to serverless functions and managed services. Monthly costs fell and scaling became automatic.

Manufacturing: Moving out of an old data centre. An ageing data centre needed costly hardware renewal. Workloads were assessed, grouped and migrated to the cloud in waves. The data centre closed on schedule.

Questions

Can I add the Business continuity and migration design project to my resume?

Yes. Once your trainer approves it, list it under Projects with the tools you used, one line on the problem it solves and a link to your repository and demo video.

How long does this project take?

About 18 hours of hands-on work, and it fits best after week 12 of the Azure 305 course.

Where do I get the step-by-step tasks?

Enrolled students get every task with steps, "done when" checks, the submission form and a trainer review in the SOTT student portal.