A company connects to two internet providers and needs control over its routes.
The detailed steps, checklists and trainer review open in the SOTT student portal for enrolled students.
Enterprise: Campus network that never stops. A single core switch failure took the whole office down. Redundant core, distribution and access layers with fast fail-over. Failures no longer cause outages.
Retail chain: Hundreds of branches online. Branch links were expensive and slow to set up. SD-WAN with centrally managed policies. New branches connect in hours.
ISP: Stable routing at scale. Routing flaps caused customer outages. Tuned OSPF and BGP with route filtering and summarisation. Routing became stable.
Yes. Once your trainer approves it, list it under Projects with the tools you used, one line on the problem it solves and a link to your repository and demo video.
About 14 hours of hands-on work, and it fits best after week 8 of the CCNP course.
Enrolled students get every task with steps, "done when" checks, the submission form and a trainer review in the SOTT student portal.