Build monitoring, a change process, config backups and automated checks into a NOC runbook.
A data centre NOC wants fewer change-related outages and faster first response.
The detailed steps, checklists and trainer review open in the SOTT student portal for enrolled students.
ISP: Outages found before customers call. Customers reported link failures before the NOC knew. SNMP and ICMP monitoring with dashboards and alert escalation for every core link. Most link failures are now detected and ticketed before customer calls.
Bank branches: Branch connectivity. Branches lost connectivity and nobody knew which link had failed. Monitoring of primary and backup links with automatic fail-over checks and runbooks. Branch outages are shorter and better documented.
Data centre: Change-related outages. Unplanned changes caused repeated outages. A change process with backups of device configs, maintenance windows and rollback plans. Change-related incidents dropped.
Yes. Once your trainer approves it, list it under Projects with the tools you used, one line on the problem it solves and a link to your repository and demo video.
About 18 hours of hands-on work, and it fits best after week 12 of the Network Operations Center (NOC) Analyst course.
Enrolled students get every task with steps, "done when" checks, the submission form and a trainer review in the SOTT student portal.